Risk-Based Inspection & Leak Path Prevention

Data-Driven Inspection to Minimise Risk and Maximise Asset Life

Inspection Recertification

Hydrasun applies Risk-Based Inspection (RBI) principles to assess and manage the condition of Flexible Hose Assemblies (FHAs) and Small Bore Tubing (SBT) systems.

In accordance with either client specific or industry standard (Energy Institute Guidelines 3rd Edition May 2025) management strategies, Hydrasun deliver a full risk analysis service focused on risk reduction.

Strategic Prevention that Delivers

Through early identification of high-risk FHA & SBT assemblies/components, our RBI process significantly reduces the chances of premature failure leading to unplanned shutdowns and environmental or safety incidents. This strategic forward-thinking approach is the best way to protect assets, minimise downtime and ensure compliance.

Customer Impact

  • Proactive Risk Mitigation – Prioritisation of inspection & replacement frequencies & non-compliance close out activities to reduce risk & extend asset life
  • Reduced HSE Exposure – Early detection of failure points in hydrocarbon & fluid containment systems for FHA & SBT
  • Optimised Maintenance Costs – Deploy necessary resources based on actual risk, reduction in maintenance costs through prioritised / efficient maintenance management

Technical Capabilities

Icon 9 black

Qualified designated project engineering management

Icon 7 black

Fully certified multi skilled technicians

Icon 4 black

FHA & SBT risk management & leak path reduction

Icon 5 black

Real-time inspection compliance reporting & dashboards - Hydralink

Icon 8 black

Integration with customer own ERP System

Predictive Precision

Hydrasun doesn’t just inspect - we predict. Our FHA & SBT risk-driven management strategies target leak paths with precision. It enables early detection, informed decision-making and long-term asset integrity to ensure operations are maximised and required maintenance is minimised.