Customer Requirement

High maintenance expenditure as result of unplanned and unnecessary remedial work associated with Flexible Hose Assemblies (FHAs).

Hydrasun solution

Develop and implement risk-based FHA inspection and maintenance programme across the fleet.

↓ Download PDF
Benefits
  • Flexible Hose Assembly maintenance expenditure reduced by more than 30% across the fleet
  • Improved fleet uptime through reduced unplanned remedial work and more effective planned maintenance
  • Technical integrity of flexible hose assemblies assured through risk-based inspection programme
  • Reduced operational, safety and environmental risks from flexible hose assembly leaks
  • Reduced cost of purchased spares and spares management costs through improved inventory management system
  • Safe and competent execution of flexible hose assembly integrity management programme
Markets